Project info
- Building
€3 Million (Mechanical, Electrical, Process Engineering)
- 2018—To Date
—Multiple Projects

Project info
- Building
€3 Million (Mechanical, Electrical, Process Engineering)
– 2018—To Date
—Multiple Projects
Systems
- Instrument Air
- Nitrogen
- Solvent Transfer Lines
- Grade D/C HVAC Systems
- Plant Steam & Condensate
- CHW
- LPHW
- LV Distribution
- Containment & Wireways
- Stand-By Power & UPS
- General Services & Small Power
- Lighting (General & Emergency)
- Fire Detection
- ATEX
- BMS & QBMS
- Data Communication
- Gas Detection & O2 Depletion
• Bimatoprost Production Cell Upgrade
OSENG were engaged to provide M&E design for the enabling works and upgrade of production Cell for a new API Product. The entire production cell is a designated ATEX Environment.
• Bund 702 Waste Water Treatment Plant
OSENG was engaged to provide M&E design services a new Wastewater Treatment System as part of the Bund 702 Upgrade in AbbVie Manorhamilton, Sligo.
• DP Reconfiguration
OSENG was engaged to provide M&E design services for the expansion of DP Suite to facilitate 140 IBC storage. The project is a full new build within the exis%ng facility in a fallow space.